Graphical Metrics: On this particular window, there are three metrics (System
Availability, Cost/FTE and Cost as a % of Revenue) represented in three ways:
overall health (represented by Harvey Balls), the actual metric represented in
graph form and the variance from the target metric.Each of the graphs contains a metric target (represented
by a red line) and colored bars to represent the relative desirability of the metric
result versus the target. For each of
the thumbnail graphs there is an associated larger detailed view that may be
viewed.
Textual Information Presented in SharePoint: This is an example of a textual view of Top
Initiatives.The first column represents
the project name.The second column is a
description of the project with the estimated cost in the third column.The fourth column contains the business value
of the project with the projected delivery quarter in the fifth column.In the sixth column is a link to the particular
project page in SharePoint with all of the project details.
SharePoint Used for Information Collection: SharePoint was used to collect information for the quarterly
Management Accountability report presented to executive management and the
Board of Directors.
Dashboard: This dashboard was created for executive
management and the Board of Directors.Most of this information was collected via SharePoint, and there was a
completed SharePoint version containing the same information.